Ji'nan low-lying South High North, East West High low, whenever the flood coming,abercrombie soldes, there are a large number of flooding from the southern mountain surging and. Ji'nan originated in the Xiaoqing River, 1000 years carrying these torrents,louboutin pas cher, through Zibo,air jordan pas cher, Binzhou,abercrombie pas cher, Weifang into the sea, assume that all work release flood waters in Ji'nan city.
November 28, 2007, vice secretary of provincial Party committee, governor Jiang Daming announced a Lashan flood diversion project. Yan Rongzhu of secretary of municipal Party committee at engineering construction requirements, to the people's life.
July 18, 2007, at eight thirty from five thirty in the afternoon to evening, the Ji'nan biggest precipitation of 153.1 mm, mountain torrents and Zhixie, strong rainfall short so that the Xiaoqing River to release flood waters, rainwater in urban areas gathered. Mountain torrent disaster in Ji'nan people bring hit at the same time,
Xiaoqing River, one in Ji'nan to "settle down" thousands of rivers, it absorbed in the river water, stream, Pentium into the sea, had placed all hopes of Jinan off torrents. However, due to the design of the standard is too low, the flood control capacity in the face of the Ji'nan huge torrents has failed.
began to build from 2007 La Shan flood diversion project has completed the first phase of the project,hollister france, the entire project completed by the end of this year, will intercept Xing Ji River, Da Jian Gou, Dou Gou three small Qinghe large tributaries, reduce release flood waters flow Xiaoqing River 53.3%.
, and the splendor, for water and beautiful at the same time because of the mountain, every flood season, city is also facing the flood threat.
thus, Lashan flood, a flood of Ji'nan engineering construction for troubleshooting, a messenger to help small Qinghe successfully completed the task of release flood waters,louboutin pas cher, a leading torrent of new force,louboutin, from 2007 started construction. This year after the project is completed, it will intercept Xing Ji River, Da Jian Gou, Dou Gou three small Qinghe large tributaries, truncated flood into the city "artery" release flood waters flow, reduce the Xiaoqing River 53.3%.
Ji'nan flood throw historical big
Ji'nan,barbour sale, a city landscape preference, the mountains around the city, the water springs students.
in order to beautiful homeland peace, never retreat of Jinan adorable wisdom spark: outside truncated mountain torrents.
then, Xiaoqing release flood waters is no longer "fight a lone battle",louboutin, Jinan years to resolve the flood dreams set sail.
also shows the river plain small Qinghe this artificial excavation has overwhelmed.
"the Xiaoqing River city flood control standard is low,hollister pas cher, narrow riverway, met the above standard flood, extremely easy to cause the water level rising, the city is difficult to enter the mainstream of Xiaoqing River tributary of the river water, easy to cause the flood." City Bureau of water resources deputy director Li Chengrang told reporters, "Ji'nan to ensure safety in flood season, we must intercept the southern mountain flood, increase the drainage outlet, the implementation of closure consists of."
in the comprehensive management of the Xiaoqing River at the same time,hogan, emerge as the times require Lashan flood diversion project.
However,barbour jackets, in
相关的主题文章:
forget where to go home for dinner
almost every day
this song into soul music
WASHINGTON, Aug. 9 (Xinhua) -- U.S. President Barack Obama on Friday pledged measures to strengthen oversight and transparency of the National Security Agency (NSA)'s classified surveillance programs following two months of controversies.
"It's not enough for me as president to have confidence in these programs. The American people need to have confidence in them as well," said Obama at a White House press conference.
He unveiled four measures as part of the efforts to stem the controversies over the surveillance programs, which have been secretly conducted for years and revealed by former NSA contractor Edward Snowden in June.
"But given the scale of this program, I understand the concerns of those who would worry that it could be subject to abuse," said Obama. |